Floor Patch & Level

Floor Patch & Level

Floor Patch & Level

Instructions

  1. Use directly from container. With smooth face trowel or putty knife, apply up to 1/4" and let dry approximately two hours to a hard consistency. Drying time will vary with temperature and thickness. (Thickness greater than 1/4" should be built up in multiple coats, allowing each to dry completely between application.) Apply when temperature is between 50° and 90°F.
  2. Test for dryness by pressing a coin to patch. No indentation indicates sufficient dryness.
  3. Clean Up: Remove excess wet Patch and Level from tools and work area with warm water. Do not allow product to dry on unwanted areas.
  4. Primer: Apply Jasco Adhesive Primer to patch and surfaces to be covered, to promote good bonding. Allow to dry completely before applying adhesive or coverings.
  5. Coverage: Quart: 3-4 square feet at 1/8" thick - Gallon: 12-16 square feet at 1/8" thick.
  6. Storage: Close container. Store in a cool dry place. Protect from freezing.

Warnings:

  • Contains less than 1% of petroleum distillate and 1% methanol.
  • Do not take internally.
  • Keep out of reach of children.